Worked example

“Landlord EICR for a 3-bedroom house with 10 circuits.”

Materials, labour and total for the worked example
MaterialQtyCost
No materials: this job is all labour.
Labour, 5.3 hours at £50.00/hour£265.00
Transport£25.00
Total£290.00

Typical UK retail prices including VAT, November 2026. Not VAT-registered example; add 20% to the total if you are. Rate is an example: use your own.

Where the time goes

  • Inspect, test and write report5.3 h

Before you quote

  • Price by circuits, not bedrooms alone: testing time follows the circuit count.
  • Say in the quote that remedial work is quoted separately.
  • Landlords often need it by a date; agree the report turnaround up front.

How the quantities are worked out

Each material is counted in the units merchants sell it in, with normal waste allowed, so you can order straight from the list. Labour is the on-site time for one competent tradesperson, including setting up, testing and clearing up. Change the measurements and the whole quote moves with them; that's what Quotable does for you on every job, with each material priced live at UK merchants.